Yarra Valley Grammar
Kalinda Road, Ringwood Victoria
Becon Constructions was engaged by Yarra Valley Grammar to enter a joint venture with Paul Sadler Swimland to begin construction work on their new Aquatic Centre project. The pool was designed by Smith and Tracey Architects and consisted of a toddlers’ pool and a 6 lane, 25m teaching pool. A grandstand was added for spectators to facilitate their needs during swimming event/carnivals. The building was designed to integrate with the school sports complex and incorporate the surrounding landscaped area. The facility was opened on Tuesday the 28th of November 2017.
KEY INFORMATION
Yarra Valley Grammar
Construction of a new swimming pool
Kalinda Road, Ringwood Victoria